Tagged: projects

8

Have I mentioned our solar?

Before leaving Bellingham at the end of May – literally, the day before – we finally got our solar install finished on Meriwether. It took so long as we waited to have a frame built for the panels to be mounted on to. It was something that I was originally going to do myself, but once I started dropping a...

3

Bellingham days coming to an end

It has been six weeks since arriving in Bellingham. Six weeks is an extremely long time for us to be stationary – matching the longest time in our four years together; six weeks during the van rebuild back in late 2017. During these weeks neither of us have taken any time off – just hammering through as much work as...

4

The long, long list

It has been all about the todo list as of late. Just crushing out as many items as we can before our mid-May departure date… did I mention I had a departure date? For every item checked off the list, two more appear. Most are simple enough, but there are a few big tasks; like adding a full solar setup,...

Almost nomadic again 2

Almost nomadic again

The entire past week has just been crap weather. Not that it was unexpected for this time of year in the Pacific North West, but Iā€™m not accustomed to all this dreariness. Kerri has been hard at work ā€“ this being her busiest time of the year ā€“ while I have continued tinkering away at odd jobs on the boat,...

Working on the boat 0

Working on the boat

It has been two weeks since we moved onto the boat. We have not left the dock yet for multiple reasons; A) There are some repairs we would like to do before we start sailing, and B) our insurance will not cover us because we do not know how to sail. Technicalities I say! Actually, we need to have 40...