Tagged: projects

8

Have I mentioned our solar?

Before leaving Bellingham at the end of May – literally, the day before – we finally got our solar install finished on Meriwether. It took so long as we waited to have a frame built for the panels to be mounted on to. It was something that I was originally going to do myself, but once I started dropping a...

3

Bellingham days coming to an end

It has been six weeks since arriving in Bellingham. Six weeks is an extremely long time for us to be stationary – matching the longest time in our four years together; six weeks during the van rebuild back in late 2017. During these weeks neither of us have taken any time off – just hammering through as much work as...

4

The long, long list

It has been all about the todo list as of late. Just crushing out as many items as we can before our mid-May departure date… did I mention I had a departure date? For every item checked off the list, two more appear. Most are simple enough, but there are a few big tasks; like adding a full solar setup,...

Almost nomadic again 2

Almost nomadic again

The entire past week has just been crap weather. Not that it was unexpected for this time of year in the Pacific North West, but I’m not accustomed to all this dreariness. Kerri has been hard at work – this being her busiest time of the year – while I have continued tinkering away at odd jobs on the boat,...

Working on the boat 0

Working on the boat

It has been two weeks since we moved onto the boat. We have not left the dock yet for multiple reasons; A) There are some repairs we would like to do before we start sailing, and B) our insurance will not cover us because we do not know how to sail. Technicalities I say! Actually, we need to have 40...